You Are Almost There.
Do Not Rush the Last Step.

The final walkthrough is your last chance to protect yourself before you sign closing documents. This guide covers what to inspect, what to document, what to do when items aren't finished, and how an experienced REALTOR changes the outcome of this appointment.

Hearts to Homes Resource Center · By Derica Wade, Associate Broker · Last reviewed August 2026

Most buyers spend months preparing to build a new home and two hours at the final walkthrough. That imbalance can be expensive. The walkthrough is not a formality. It is a documented inspection appointment with real consequences for what you accept at closing.

Jump To
Understanding the Process

What Is the Final Walkthrough?

The final walkthrough is a scheduled appointment, typically one to five days before your closing date, where you tour the completed home with a representative from the builder. The purpose is twofold: the builder shows you how the home operates, and you identify anything that needs attention before or shortly after closing.

It is important to understand what the final walkthrough is and what it is not. This appointment is an orientation and a documentation session. It is not an independent inspection. The builder's representative is there to demonstrate systems, answer questions, and walk you through the official punch list process. They are knowledgeable and often genuinely helpful. They also work for the builder.

That distinction matters. Your REALTOR and, ideally, your own independent inspector should be present alongside the builder's team. The walkthrough is most effective when you arrive prepared, slow, and specific.

Important Distinction

The builder's final walkthrough is not a substitute for an independent inspection. We recommend scheduling your own licensed inspector before the builder's walkthrough so you arrive with your own documented findings already in hand. For details on what independent inspections cover and when to schedule them, see our New Construction Inspection Guide.

The walkthrough is where two tracks of information come together: what your inspector found, and what the builder acknowledges needs to be corrected. Both lists matter. The punch list you leave with, signed by the builder's representative, becomes the document that governs your post-closing follow-up.

Timing and Attendees

When It Happens and Who Should Be There

When the Walkthrough Is Scheduled

Builders typically schedule the final walkthrough one to five business days before your closing date. On production homes in Southeast Michigan, the builder's superintendent or a designated customer care representative coordinates the appointment once the home has passed its local municipal inspections and the Certificate of Occupancy is issued or imminent.

The scheduling window is not always generous. Some builders notify buyers three to five days in advance. This is why it is worth confirming with your builder and your REALTOR as you approach your anticipated closing month so you are not arranging last-minute coverage. If you also want an independent inspector at the walkthrough, that inspector needs advance notice too.

Who Should Attend

At minimum, you and your REALTOR should both be present. If you have a spouse or partner who will be on the title, both buyers should attend. If an independent inspector is attending, they typically arrive slightly before the builder walkthrough or simultaneously, depending on the arrangement your REALTOR coordinates with the builder.

You
The Buyer
Both buyers if applicable. This is your home and your closing. You need to see it with your own eyes and be present for the orientation. Do not send a family member in your place.
Your REALTOR
Your Advocate
Your REALTOR has attended many of these appointments. They know what to slow down for, what is normal, and which items are documentation leverage points. Their presence changes the tone.
Your Inspector
Independent Eyes
A licensed inspector hired by you. Ideally present before or during the builder walkthrough. Their findings give you a report the builder cannot contest as subjective. This is the investment that pays for itself.
Builder Rep
Builder's Team
Usually the superintendent who oversaw construction or a customer care specialist. Knowledgeable about the home's systems. Their job is to walk you through the home and document the punch list.

One practical note: if at all possible, do not bring young children to the final walkthrough. A new construction home is not fully finished and may have sharp debris, open areas, and equipment nearby. More importantly, a two-year-old exploring the garage requires your attention, and the walkthrough requires your full focus. Arrange childcare for this appointment.

How Long It Takes

Plan for two to three hours on a production home in the 2,000 to 3,500 square foot range. Builders typically schedule 90 minutes to two hours. If your independent inspector is present or if you have a longer punch list, the appointment will run longer. Do not schedule anything immediately afterward. Rushing the walkthrough is one of the most common and costly mistakes buyers make.

Finished primary bedroom in a new construction home in Southeast Michigan, ready for the final walkthrough before closing
The primary suite of a completed new construction home in Southeast Michigan. The final walkthrough is your opportunity to confirm every room is finished to specification before you sign closing documents.
Preparation

What to Bring

Arriving prepared is the single biggest thing you can do to improve the quality of your walkthrough. The builder's representative knows this home better than you do at this stage. Your preparation narrows that gap.

  • Your purchase agreement and all addenda. Know what you paid for, including lot premiums, structural options, and any credits the builder promised.
  • Your design center selections sheet. This is the itemized list of every upgrade you selected and paid for. Verify each one is installed correctly. Cabinets, countertops, flooring, fixtures, appliances, and tile should all match what you signed.
  • Your independent inspection report, if your inspector has already been through the home. Bring it with notes on which items you want to verify during the walkthrough.
  • A flashlight. Even a finished home has dark corners, attic access hatches, and crawl spaces that need light. Your phone flashlight works, but a dedicated flashlight is brighter and frees your hands.
  • An outlet tester or phone charger. Plug into outlets in every room. An outlet tester (available for under $15) tells you immediately whether an outlet is wired correctly. Testing every outlet takes two minutes per room and catches reversed polarity or ungrounded wiring the builder may have missed.
  • Painter's tape or sticky notes. Mark items on the punch list in place so the builder's representative can see exactly where the issue is. A nick in the drywall is easier to document and harder to dispute when it has a tape marker on it.
  • A notepad and pen. Take your own notes, not just what the builder's rep writes down. Document everything you want addressed, even items the builder says are within tolerance or will resolve on their own.
  • Comfortable clothes and shoes. You will be crawling under sinks, stepping into the garage, checking the attic hatch, and walking every inch of the home.
Before You Arrive

Review your design center selection sheet the night before. Many buyers discover during the walkthrough that a cabinet color, countertop edge, or appliance model is wrong. Catching this during the walkthrough, with documentation in hand, is much easier than catching it after you have moved in and the builder's team is no longer on the property.

The Inspection

What to Look For Room by Room

Walk the home methodically rather than following the builder's representative from point to point on their schedule. A systematic room-by-room approach means nothing gets skipped because the conversation moved to another topic. Start at the front door and work clockwise through each level.

Exterior & Lot Grading
  • Grading slopes away from foundation on all sides
  • Driveway and walkway are complete and level
  • All exterior doors and garage doors operate smoothly
  • Exterior paint, trim, and siding are complete with no gaps or damage
  • Window and door caulking is continuous and sealed
  • Gutters and downspouts installed and draining away from foundation
  • Sod, seed, or landscaping matches contract specifications
  • Exterior lights and outlets are functional
Garage & Mechanical Systems
  • Garage door opener operates and auto-reverses on obstruction
  • Fire door between garage and house is self-closing
  • Furnace, water heater, and water softener are installed and functional
  • HVAC filter is installed, note size for future replacements
  • Main water shutoff, gas shutoff, and circuit panel locations confirmed
  • Circuit panel is labeled accurately
  • Sump pump is present and operational if applicable
  • Garage floor is free of cracks beyond hairline settling
Kitchen & Appliances
  • All appliances are the correct model and finish per design center selections
  • Refrigerator, dishwasher, range, and microwave all operate
  • Dishwasher drain loop is installed (prevents backflow from garbage disposal)
  • Cabinet doors and drawers close flush and soft-close if specified
  • Countertops are the correct material, edge profile, and color
  • Backsplash tile is complete with no cracked or missing pieces
  • Garbage disposal operates
  • Under-sink plumbing is leak-free; run water and check
  • Range hood or microwave vents properly
  • Island and peninsula seams are tight
Bathrooms & Plumbing
  • Run all faucets; check water pressure and hot/cold mix
  • All drains clear and draining at full flow
  • Toilets flush and fill completely; no running after refill
  • Shower and tub tile is complete; grout is sealed
  • Shower door or enclosure is installed and seals properly
  • GFCI outlets within six feet of water are functional; test reset button
  • Exhaust fans operate in all bathrooms
  • Caulking at tub/shower base is continuous
  • Vanity cabinets and mirrors match design selections
Living Areas & Bedrooms
  • Test every outlet in every room with outlet tester
  • All light switches operate the correct fixtures
  • Ceiling fans are installed where specified and spin on both directions
  • Flooring type and color matches design selections
  • Hardwood or LVP flooring is flat; no high spots, gaps, or hollow sections
  • Carpet has no seams in high-traffic areas; pile runs in same direction
  • All doors latch and lock; no dragging or misaligned jambs
  • Windows open, close, lock, and screen properly
  • Fireplace operates if applicable
  • Paint color and sheen match specifications; no visible roller marks
  • Crown molding, baseboard, and trim are fully nailed and caulked
Basement, Attic & Laundry
  • Basement walls and floor are free of cracks beyond hairline settling
  • No signs of moisture intrusion or efflorescence on basement walls
  • Attic access hatch opens and has insulation in place
  • Attic insulation depth meets contract specifications
  • Laundry connections are in correct location; run washer cycle and verify drain
  • Dryer vent terminates to exterior and is not kinked
  • Egress window in basement bedroom if applicable; verify operation
  • Radon mitigation system installed and sealed if applicable
Do Not Skip This

Run water in every sink and shower and then check under every cabinet and behind every toilet for leaks. This takes three minutes per bathroom and has caught legitimate plumbing issues on final walkthroughs in Southeast Michigan that would have cost thousands to address post-move-in. Run the dishwasher on a quick cycle and check the connection under the sink when you come back around.

Documentation

What Is a Punch List?

A punch list is the official written record of items the builder agrees to complete or correct. Both you and the builder's representative sign it during or at the conclusion of the walkthrough. The punch list is a legally meaningful document. It establishes what was outstanding at the time of closing and what the builder is committed to addressing.

The term comes from construction management, where superintendents would punch a hole next to each item on a paper list as it was completed. The list of items that had not yet been punched off became the punch list. The name stuck, and the document still serves the same function: it is the active record of what the builder owes you.

What a Punch List Entry Should Include

Location: Primary bathroom, north wall

Description: Grout missing from two tile joints left of shower valve, approximately 2 inches each

Category: Cosmetic

Committed completion date: Within 14 days of closing

Vague entries like "touch up bathroom tile" are harder to enforce. Specific entries with location and description protect you if the builder's follow-up team arrives and claims they cannot find the item.

Getting the Punch List in Your Hands

Do not leave the walkthrough without a signed copy of the punch list. Ask the builder's representative to sign it before you leave the property. If they use a digital system, request that a copy be emailed to you before the appointment ends or, at the very latest, before your closing date. If you cannot get a signed document at the walkthrough, follow up in writing the same day summarizing what was documented.

Your REALTOR should review the punch list before you sign anything at closing to confirm that everything discussed during the walkthrough is captured accurately.

Building a New Home in Southeast Michigan?

We attend every walkthrough alongside our buyers. A second set of experienced eyes catches things that get glossed over, and our presence changes how the builder's team approaches the appointment.

Triage

Cosmetic vs. Functional Issues

Not every punch list item carries the same weight. Understanding the difference between cosmetic and functional issues helps you prioritize what needs to be resolved before you close versus what can reasonably carry over to post-closing completion.

Cosmetic Issues
Surface-level items that do not affect how the home functions. Paint touch-ups, drywall nicks, trim gaps, grout lines, a scratched cabinet door, a ding in the garage door panel. These items are real and should be documented, but they do not affect your ability to live in the home safely. They are appropriate to carry over to a post-closing punch list with a committed timeline.
Functional Issues
Items that affect how a system or component performs: a door that will not latch, an outlet with no power, a window that will not open, a garage door that reverses mid-close, a shower drain that backs up, a furnace that won't reach temperature, or missing appliances. Functional items should generally be resolved before closing. Accepting a non-functional component without documentation creates a dispute risk.

The Gray Area: Items That Seem Cosmetic But Aren't

Some items look cosmetic but have functional implications. Grading that appears to be a lawn issue is actually a drainage and foundation protection issue. A gap in exterior caulking around a window looks like a finishing detail but is an energy and water intrusion issue. Cracked caulking at a bathtub base looks like aesthetics but is a moisture infiltration path. Your independent inspector is trained to distinguish between the two. This is another reason their presence matters.

When the builder's representative describes something as "within tolerance" or "normal for new construction," that may be accurate or it may not. Your inspector can tell you which is which. When in doubt, document it on the punch list regardless of how the builder categorizes it. Documentation costs you nothing, and it creates a record that the issue was identified before closing.

The Closing Decision

Can You Close With Punch List Items Remaining?

Yes, and it happens frequently. Production builders in Southeast Michigan regularly close homes with minor outstanding cosmetic or finish items. The question is not whether you can close with open items. The question is whether those items are documented, whether the builder is committed to a timeline, and whether you have a mechanism to ensure follow-through.

What You Need Before You Close

Before you sign closing documents with any punch list items outstanding, you need three things:

  1. A signed punch list with every outstanding item described specifically, including location and description, not just category.
  2. A committed completion timeline from the builder, in writing. "We'll take care of it" is not a timeline. "Within 30 days of closing" or "before October 15" is a timeline.
  3. A resolution mechanism if the work is not completed. This could be a closing credit, a repair escrow holdback, or a written warranty claim process outlined in your contract. Your REALTOR and potentially your attorney can advise on which is most appropriate for your situation.

Closing Credits and Repair Escrow Holdbacks

A closing credit is a dollar amount applied to your closing costs or credited to you at closing in exchange for accepting the home with an unfinished item. A repair escrow holdback is a sum held in escrow by the title company, released to the builder only after the outstanding work is confirmed complete. Holdbacks provide more protection because the builder has a financial incentive to complete the work.

Not all builders will agree to holdbacks, and some lender guidelines restrict them. Your REALTOR can help you understand what your contract permits and what is appropriate to request given the nature of the outstanding items.

Never Do This

Do not close on a new construction home without a documented record of outstanding items. Verbal assurances that punch list items will be handled are not enforceable. Once you close without documentation, you are relying entirely on the builder's goodwill. The punch list, signed before closing, is your protection.

What Your Builder Contract Says About Substantial Completion

Your builder's purchase agreement likely defines a concept called "substantial completion," which is the builder's threshold for when the home is considered finished enough to close. Read this language carefully and ask your REALTOR to review it with you. As we cover in our Builder Contracts Explained guide, "substantial completion" can trigger your rate lock timeline and closing deadline obligations even if the home is not finished to your satisfaction. Understanding this language before your walkthrough puts you in a much better negotiating position.

The Legal Threshold

Certificate of Occupancy & Builder Orientation

What Is the Certificate of Occupancy?

A Certificate of Occupancy (CO) is issued by the local municipality after the home passes the required code inspections at completion. In Michigan, a CO is required before a new construction home can be legally occupied. Your lender will typically require the CO as a condition of funding your loan. If the CO has not been issued by your closing date, your closing may be delayed.

The CO confirms that the home meets the Michigan Building Code for occupancy. It is not a substitute for an independent buyer inspection. Municipal inspectors verify that the home meets minimum standards required by law. Your inspector looks at workmanship quality, installation details, grading, and items that may not rise to a code violation but still affect your comfort, maintenance costs, and future warranty claims. Both matter. Neither replaces the other.

For a full explanation of how the CO fits into the closing process, see our Certificate of Occupancy overview for Michigan buyers.

Michigan Note

Michigan municipalities vary in how and when they issue the Certificate of Occupancy. Some issue it upon passing final inspection; others issue it only after all inspections are recorded and paperwork is filed. Confirm the CO status with your builder at least one week before your scheduled closing to avoid a last-minute delay.

Builder Orientation: What to Pay Attention To

Builder orientation is the instructional portion of the final walkthrough, where the builder's representative demonstrates how the home's systems and features operate. This is genuinely useful information. Pay attention and take notes, or record video on your phone if the builder permits it.

Topics typically covered during orientation include:

  • HVAC system operation including thermostat programming, filter location and size, and how to register the equipment warranty
  • Water heater settings and how to adjust temperature safely
  • Main water shutoff location and how to use it in an emergency
  • Gas shutoff location if applicable
  • Circuit panel location, labeling, and how to reset a tripped breaker
  • Fireplace operation if applicable, including pilot light, ignition, and maintenance requirements
  • Garage door including how to operate manually in a power outage, how to adjust force sensitivity, and where the safety reversal button is
  • Exterior grading and drainage including what to maintain to keep water moving away from the foundation
  • Warranty registration process and how to file warranty claims with the builder
  • Sump pump operation and maintenance if applicable

Write down the locations of everything the builder points out during orientation. Where is the main water shutoff? Where is the gas shutoff? Where is the circuit panel? These are things you will need quickly in an emergency and will not remember in six months. A quick phone video of each location is faster than a paragraph of notes.

You will not remember where the main water shutoff is at 11pm when a pipe is leaking. That two-minute video you took during orientation is worth its weight in damage estimates.

From Experience

Tips From an Experienced REALTOR

We have attended dozens of final walkthroughs on new construction homes across Southeast Michigan. A few things we have learned that do not always show up in the standard walkthrough checklist:

Slow Down When the Builder's Team Is Moving Fast

Builder representatives are efficient. They have a schedule, other appointments, and a closing deadline to meet. That efficiency is not adversarial, but it can move past items that deserve a longer look. Your REALTOR is there to slow things down when needed. If you want to spend ten minutes in the primary bathroom running fixtures and checking tile, you are entitled to that time. Do not let the pace of the appointment rush you past something important.

Bring Your Design Center Selections and Compare Them Physically

We have seen wrong cabinet colors, wrong countertop edges, wrong appliance finishes, and wrong flooring products installed in finished homes. The builder did not intend to get it wrong, but production homes have long timelines and many moving parts. Catching a wrong selection at the walkthrough costs the builder a swap. Catching it six months after closing when it is cosmetic costs you a much harder negotiation. Bring your selections document and physically compare each item.

Test Everything That Moves or Has Power

Every outlet. Every switch. Every door. Every window. Every faucet. Every appliance. Builders miss things. Municipal inspectors miss things. Your independent inspector may not have tested every single outlet because that is not the scope of a standard inspection. You are at the walkthrough in person. Test everything.

Do Not Accept "It Will Dry" or "It Will Settle" as a Final Answer

Some cosmetic issues genuinely do resolve over time as new construction dries and settles. Nail pops in drywall are one example. But not every item that gets the "it will settle" explanation actually will. Document the item on the punch list regardless, with the builder's explanation noted. That way, if it does not resolve in the first year, you have a record that it was identified before closing and carries forward into your warranty period.

Get the Superintendent's Direct Contact Information

The superintendent who oversaw your home's construction knows it better than anyone. Get their direct phone number and email before you leave the walkthrough. Post-closing warranty calls go through the builder's customer care system, which may or may not reach the right person quickly. Having a direct contact for the person who built the home is useful for the first 30 to 60 days.

If Something Does Not Feel Right, Say So

You do not need to know the technical reason something is wrong to document it. If a door does not feel right when it swings, write it down. If the floor sounds hollow underfoot in an area where it should not, write it down. If a window seal looks cloudy, write it down. Your inspector can tell you whether it is significant. The walkthrough is not the time to be uncertain about whether something is worth mentioning.

Coffered ceiling detail in a finished new construction home in Southeast Michigan, an example of a design center upgrade to verify during the final walkthrough
Design center upgrades like coffered ceilings, specialty millwork, and premium cabinetry should be verified during the walkthrough against your signed design center selections sheet.
What to Avoid

Common Mistakes Buyers Make During the Walkthrough

The following mistakes come up repeatedly on new construction walkthroughs in Southeast Michigan. Most of them are easy to avoid with preparation.

Rushing Because the Closing Is Scheduled

The closing date creates pressure. That pressure can cause buyers to move through the walkthrough faster than they should, especially when the builder's representative is efficient and the energy in the room is forward-moving. Your closing date does not move up if you take three hours instead of 90 minutes. Take the time the home requires.

Not Bringing Your Design Center Selections

This is the most common omission. Without your selections document, you cannot verify that what is installed matches what you paid for. The builder representative has hundreds of homes and hundreds of selections to track. Errors happen. You are the one who knows exactly what you chose and what it cost. Bring the document.

Not Attending with Your REALTOR

The walkthrough is an appointment your REALTOR should attend alongside you. Buyers who attend the builder walkthrough alone sometimes feel the social pressure of the moment and accept explanations they might have questioned with a second set of experienced eyes in the room. This appointment is not adversarial, but it is a negotiation, and having your advocate present matters.

Skipping the Independent Inspection

The builder's final walkthrough is not an inspection. A licensed inspector hired by you, attending either before or simultaneously with the builder walkthrough, provides a documented, independent assessment. Our New Construction Inspection Guide covers what to schedule, when to schedule it, and what inspectors typically find on Southeast Michigan new builds.

Not Getting the Punch List Signed Before Leaving

Some buyers leave the walkthrough with verbal assurances and a promise that the punch list document will be emailed later. Do not let this happen if you can avoid it. Get the signed punch list in hand before you leave the property. If the builder uses a digital system, watch them submit it and confirm receipt before you get in your car.

Accepting "That Is Normal for New Construction"

Some things genuinely are normal for new construction: minor drywall nail pops in the first year, hairline settling cracks at corners and door frames, minor seasonal wood movement. But this explanation gets applied too broadly. Document it anyway. If it is truly normal and resolves on its own within the first year warranty window, nothing is lost. If it is not normal and you have no documentation, your warranty claim is harder to support.

Forgetting to Register Appliance and System Warranties

This is not a walkthrough mistake exactly, but it belongs here because the walkthrough is when you first see the appliance brand and model numbers. Most appliances have a 90-day or one-year manufacturer warranty registration requirement. Register every appliance and mechanical system before you move in. The builder's orientation should cover this, but if it does not, ask for model numbers and register them yourself within the first week of ownership.

Putting It Together

The Walkthrough Is Your Last Line of Protection

Everything you have done over the course of a new construction build, from selecting your community to choosing a floor plan, negotiating the contract, surviving the design center, scheduling inspections, and arranging financing, comes down to this final appointment. The walkthrough is where you confirm that the home you are about to close on matches what you paid for and what you were promised.

The builders we work with in Southeast Michigan build good homes. The walkthroughs that go smoothly are the ones where buyers are prepared, present, and specific. The walkthroughs that produce regret are the ones where buyers were rushed, unprepared, or did not have the right people in the room.

Take your time. Bring your documents. Test everything. Document what you see. Get the punch list signed before you leave. And make sure you have a REALTOR who knows what to look for walking through that door beside you.

A Note

This guide is educational and reflects general practices for new construction in Southeast Michigan. Contract terms, builder policies, and municipal requirements vary. Always review your specific purchase agreement and consult with your REALTOR and legal advisor before making decisions around your closing.

Frequently Asked Questions

Final Walkthrough Questions Answered

What is the new construction final walkthrough?

The final walkthrough is a scheduled appointment, typically one to five days before closing, where you tour the completed home with a builder representative. The builder shows you how mechanical systems operate, points out any remaining work, and records items on the official punch list. It is an orientation and documentation session, not an independent inspection. We recommend scheduling your own independent inspector before the builder walkthrough so you arrive with your own findings already documented.

What is a punch list in new construction?

A punch list is the official written record of items the builder agrees to complete or correct before or after closing. Both buyer and builder representative sign it during the final walkthrough. The punch list is a legally meaningful document: it establishes what was outstanding at the time of closing and what the builder is committed to fixing. Never leave a walkthrough without a signed copy of the punch list in hand.

Can you close on a new construction home if punch list items aren't finished?

Yes, and it happens frequently. Production builders often close homes with minor outstanding items. The key is documentation. Before closing with open items, you need them listed on a signed punch list with a committed completion timeline, and ideally a closing credit or repair escrow holdback to ensure follow-through. Your REALTOR helps you decide what is reasonable to accept versus what needs to be resolved before you hand over your down payment. Closing without any documentation of outstanding items is the mistake to avoid.

What is the difference between cosmetic and functional punch list items?

Cosmetic items are surface-level issues that do not affect how the home functions: paint touch-ups, minor drywall nicks, grout gaps, a scratched cabinet door, a trim piece not flush. Functional items affect how a system or component performs: a door that does not latch, an outlet with no power, a window that will not open, a garage door that reverses mid-close, or a shower drain that backs up. Functional items should generally be resolved before you close. Cosmetic items can reasonably carry over to the punch list as long as the builder commits to a timeline.

Do I need a REALTOR at the final walkthrough?

Yes. Your REALTOR should be present at every walkthrough, including the builder's orientation. The builder's representative is experienced at managing this appointment and will move through it efficiently. Your REALTOR slows things down when needed, documents items the builder may pass over quickly, ensures nothing is glossed over, and knows which issues are negotiating points versus normal new-construction settling. Having your own advocate in the room costs you nothing and changes the dynamic of the conversation.

What is a Certificate of Occupancy and do I need one to close?

A Certificate of Occupancy (CO) is issued by the local municipality after the home passes required code inspections at completion. Michigan requires a CO before a new construction home can be legally occupied. Your lender will typically require the CO as a condition of funding the loan. The CO confirms code compliance but does not replace an independent buyer inspection. For a full explanation, see our Certificate of Occupancy overview for Michigan.

How long does a final walkthrough take on a new construction home?

Plan for two to three hours for a production home in the 2,000 to 3,500 square foot range. Smaller homes may take 90 minutes; larger custom builds can run four hours or more. The builder typically schedules one to two hours. Add time if you have an independent inspector present. Rushing a walkthrough is one of the most common mistakes buyers make. If you feel the builder's representative is moving too quickly, it is appropriate to slow down and take your time.

What should I bring to the final walkthrough?

Bring your signed purchase agreement and design center selections so you can verify every option you paid for is installed correctly. Bring a flashlight, phone charger or outlet tester, painter's tape to mark items, a notepad, and a camera. Review your independent inspection report before you arrive. Wear comfortable shoes and arrange childcare so you can focus fully on the appointment.

What happens during the builder orientation?

Builder orientation is the part of the walkthrough where the builder's representative walks you through how the home operates: how to program the thermostat, where the circuit panel is, how to operate the fireplace, where the main water shutoff is, how to reset a GFCI outlet, how to maintain exterior grading and drainage, and what the warranty claim process looks like. Take notes or record short phone videos. This information is practical and immediate, and most homeowners wish they had written it down more carefully.

Can I request a second walkthrough before closing?

Yes, and you should if the first walkthrough reveals significant incomplete work or if you want to verify that previously identified items were resolved correctly. Most builders will schedule a second walkthrough, sometimes called a verification walkthrough or re-walk, to confirm punch list items were addressed. Request it in writing and confirm the appointment at least a week before your closing date to avoid a last-minute situation.

Before You Go

Every home purchase is unique, and every builder, community, purchase agreement, lender, municipality, and title company may have different policies, timelines, requirements, and procedures.

The information in this guide is provided for educational purposes to help you better understand the new construction process and ask informed questions along the way. It is not intended to replace the guidance of your REALTOR®, builder, lender, inspector, attorney, title company, or other professionals involved in your transaction.

Builder policies regarding third-party inspections, construction access, walkthroughs, warranties, completion standards, timelines, and closing procedures can vary. Always review your builder’s specific requirements and consult with the appropriate professionals regarding your individual situation.

If you’re buying a new construction home in Southeast Michigan, we’re always happy to answer your questions and help you understand what applies to your specific home, builder, and community.

Ready to Close with Confidence?

You Deserve a REALTOR Who Shows Up at Every Walkthrough

We attend every final walkthrough alongside our new construction buyers, from the first independent inspection to the keys in your hand. We know what to slow down for, what to document, and how to make sure you close on a home that matches everything you paid for and were promised.

Building a new home in Southeast Michigan should be exciting, not stressful. That is exactly what we are here for.